Indianapolis Power & Light

Location: Petersburg, Indiana

Contractor:  Indianapolis Power & Light

Owner:  Indianapolis Power & Light

Scope of Work:  Unit 4 Outage Work – Remove and install insulation on High Energy Piping.  Applied 10,169 sq ft of 10# x 3″ thick Thermawrap High Temperature Insulation along with 6,200 LF of stucco embossed aluminum jacket.

Date Completed:  April 2010

President’s Message

Welcome Joy Veatch, Assistant Controller

Posted: 03/06/17 By: Megan Knoll, Dir of Marketing

We welcome Ms. Veatch to the Gribbins Insulation team.

Read Full Article

Open Position: Payroll Administrator

Posted: 03/03/17 By: Megan Knoll, Dir of Marketing

Apply at ZipRecruiter. Link in post.

Read Full Article
rss

Toolbox Talk

Emergency Action Plan

Posted: 04/17/17 By: Trevor Atherton, Safety Mgr

The purpose and definition of an emergency action plan, as defined by OSHA.

Read Full Article

Hazard Recognition – Part 1

Posted: 04/10/17 By: Trevor Atherton, Safety Mgr

A list of some of the common jobsite hazards.

Read Full Article