" order_by="sortorder" order_direction="ASC" returns="included" maximum_entity_count="500"]

Indianapolis Power & Light

Location: Petersburg, Indiana

Contractor:  Indianapolis Power & Light

Owner:  Indianapolis Power & Light

Scope of Work:  Unit 4 Outage Work – Remove and install insulation on High Energy Piping.  Applied 10,169 sq ft of 10# x 3″ thick Thermawrap High Temperature Insulation along with 6,200 LF of stucco embossed aluminum jacket.

Date Completed:  April 2010

President’s Message

Welcome Joy Veatch, Assistant Controller

Posted: 03/06/17 By: Megan Knoll, Dir of Marketing

We welcome Ms. Veatch to the Gribbins Insulation team.

Read Full Article

Open Position: Payroll Administrator

Posted: 03/03/17 By: Megan Knoll, Dir of Marketing

Apply at ZipRecruiter. Link in post.

Read Full Article
rss

Toolbox Talk

Pinch Points

Posted: 05/22/17 By: Trevor Atherton, Safety Mgr

A pinch point is any point at which it is possible for a person or part of a person’s body to be caught between a stationary object and moving object or between moving parts or objects.

Read Full Article

Electrical Safety

Posted: 05/15/17 By: Trevor Atherton, Safety Mgr

Electricity can become very dangerous if not handled properly. Follow these rules to stay safe!

Read Full Article