Indianapolis Power & Light

Location: Petersburg, Indiana

Contractor:  Indianapolis Power & Light

Owner:  Indianapolis Power & Light

Scope of Work:  Unit 4 Outage Work – Remove and install insulation on High Energy Piping.  Applied 10,169 sq ft of 10# x 3″ thick Thermawrap High Temperature Insulation along with 6,200 LF of stucco embossed aluminum jacket.

Date Completed:  April 2010

President’s Message

Allie Redman Joins Gribbins Insulation as Payroll Administrator

Posted: 06/20/17 By: admin

Welcome Allie to the Gribbins team!

Read Full Article

Crystal Eagle Winner – Again!

Posted: 06/06/17 By: Megan Knoll, Dir of Marketing

Gribbins won the prestigious CCS Crystal Eagle at their annual banquet in May 2017 for the second time.

Read Full Article
rss

Toolbox Talk

Spotter

Posted: 05/29/17 By: Trevor Atherton, Safety Mgr

The responsibilities of a spotter and the importance of their job

Read Full Article

Pinch Points

Posted: 05/22/17 By: Trevor Atherton, Safety Mgr

A pinch point is any point at which it is possible for a person or part of a person’s body to be caught between a stationary object and moving object or between moving parts or objects.

Read Full Article