" order_by="sortorder" order_direction="ASC" returns="included" maximum_entity_count="500"]

Gibson Southern High School

Location:  Ft. Branch, Indiana

Contractor:  Goebel Mechanical

Owner:  Gibson County School Corp.

Scope of Work:  Mechanical insulation of approximately 36,651 LF of plumbing and HVAC piping systems and  equipment. There was 101,964 SQFT of duct insulation in mineral fiber flexible duct wrap and
rigid board insulation installed throughout this project from classrooms to mechanical rooms.

Date Completed:  March 2010

President’s Message

Core Values Update

Posted: 08/23/17 By: Megan Knoll, Dir of Marketing

Integrity, Safety, Quality, and Service are the four cornerstones of our work.

Read Full Article

NEW Points Redemption Site!

Posted: 08/01/17 By: Megan Knoll, Dir of Marketing

Visit www.gribbinspoints.com to redeem your points!

Read Full Article
rss

Toolbox Talk

Excavation, Trenching, and Shoring

Posted: 07/31/17 By: Trevor Atherton, Safety Mgr

Follow all OSHA rules and regulations when working in excavations and trenches.

Read Full Article

Hearing Protection

Posted: 07/24/17 By: Trevor Atherton, Safety Mgr

Although noise-induced hearing loss is one of the most common occupation illnesses, it is often ignored because there are no visible effects.

Read Full Article